Insta

Govt Begins Process To Install 1000 MWh Battery Energy Storage System

India InfrahubOct 15, 2021, 05:55 PM | Updated 05:55 PM IST
Tesla Megapack battery setup. A Representative Image (Pic Via Tesla Website)

Tesla Megapack battery setup. A Representative Image (Pic Via Tesla Website)


The government has given the go-ahead for installing a 1000 MWh Battery Energy Storage System (BESS) as a pilot project by inviting the expression of interest.

This project is the joint effort of the Ministry of New and Renewable energy and the Ministry of Power. They have been working on this to provide a road map for installing the energy storage system in the country.


Solar Energy Corporation of India (SECI), a Central Public Sector Enterprise under the Ministry of New and renewable energy, has called for the expression of interest for procurement of 1000 MWh BESS.

“This (EoI) will be published along with the RFS bid document and the draft comprehensive guideline for procurement and utilisation of BESS as a part of generation, transmission and distribution assets and with all ancillary services,” the official statement said.

Join our WhatsApp channel - no spam, only sharp analysis