Insta
Swarajya Staff
Mar 01, 2019, 03:30 PM | Updated 03:30 PM IST
Save & read from anywhere!
Bookmark stories for easy access on any device or the Swarajya app.
Nitin Gadkari, Union Minister for Road Transport & Highways, today (1 March) laid the foundation stone for a six-lane access-controlled NH project at Kalindi Kunj-Meethapur Road in Delhi.
दिलà¥à¤²à¥ à¤à¥ मà¥à¤ ापà¥à¤° मà¥à¤ 3580 à¤à¤°à¥à¤¡à¤¼ à¤à¥ लाà¤à¤¤ सॠ6 लà¥à¤¨ राषà¥à¤à¥à¤°à¥à¤¯ राà¤à¤®à¤¾à¤°à¥à¤ à¤à¤¾ शिलानà¥à¤¯à¤¾à¤¸ à¤à¤¿à¤¯à¤¾à¥¤ à¤à¤¸à¤à¥ निरà¥à¤®à¤¾à¤£ सॠदिलà¥à¤²à¥-à¤à¤¨à¤¸à¥à¤à¤° à¤à¥ à¤à¤¶à¥à¤°à¤®-बदरपà¥à¤°-बलà¥à¤²à¤à¤à¤¢à¤¼-à¤à¤²à¤¾à¤à¥ मà¥à¤ à¤à¥à¤°à¥à¤«à¤¿à¤ à¤à¤¾ बà¥à¤ à¤à¤® हà¥à¤à¤¾à¥¤ @KPGBJP @rameshbidhuri#PragatiKaHighway #NamumkinAbMumkinHai pic.twitter.com/kXlDFNOxjN
— Nitin Gadkari (@nitin_gadkari) March 1, 2019
The 59 km long highway will begin at Ring Road-DND junction passing through Kalindi bypass and Faridabad-Ballabhgarh bypass and shall finish at the interchange of Delhi-Mumbai Expressway at KMP, reports Press Information Bureau.
The project shall have 7,350 km of the elevated section with two level crossings at four locations of Metro line, 3+3 lane service roads on either side for about 29 km, nine interchanges with improved junctions and 18 new underpasses.
With this project, traffic congestion in Delhi’s Ashram-Badarpur-Faridabad-Ballabhgarh region shall be significantly reduced. Furthermore, a reduction in vehicular pollution is also expected.