Insta
Swarajya Staff
Jul 05, 2018, 06:56 PM | Updated 06:56 PM IST
Save & read from anywhere!
Bookmark stories for easy access on any device or the Swarajya app.
The Waltair (Visakhapatnam) railway division of the East Coast Railway (ECoR) built a limited-height subway to replace a level crossing on the Kottavalsa-Pendurti section of the Chennai-Kolkata mainline in a record of four hours and 30 minutes.
The standard time taken to build such a subway is six to eight hours for a structure under two tracks. The Wailtair division however, finished it in less time, that two under four tracks.
According to a statement by ECoR, the underpass was built a t a cost of Rs 2.6 crore and involved inserting 20 precast concrete boxes and 15 base slabs.
300 men were involved in the construction that involved six excavators, three cranes, five tippers, four hydra machines, and ten heavy jacks.
You can watch the video here:
Feat! Underpass built in a record time of 4hrs 30 minutes in Waltair division (Vishakapatanam) on Indian Railways! @RailMinIndia @drmwat_ecor @eastcoastrail @gmeastcoastrly @PiyushGoyal @PiyushGoyalOffc pic.twitter.com/voTtfNWI6J
— Rajendra B. Aklekar (@rajtoday) July 5, 2018